Tower launched for Moncofa desalination intake

A reinforced concrete tower which will form the intake structure of the Moncofa desalination plant was launched by the Spanish regional water authority Acuamed on 26 June 2012 at the port of Castellón de Burriana on the Mediterranean coast.

The 93 t intake tower for the Moncofa desalination plant ready for float-out.

The 93 t intake tower for the Moncofa desalination plant ready for float-out.

The € 55.3 million Moncofa plant, which will have a production capacity of 10.5 million m³/year, is in the final phase of construction

The project includes 8 km of pipelines for product distribution and a 30,000 m³ tank. The intake tower, which was towed into place, weighs 93 t and is 4 m high with an 8 m diameter.

Tags




Click a keyword to see more stories on that topic, view related news, or find more related items.

© Faversham House Group Ltd 2012. Water. desalination + reuse news articles may be copied or forwarded for individual use only. No other reproduction or distribution is permitted without prior written consent.