Poseidon defeats legal challenge to Huntington Beach project
16 Jan 19 by desalination

Sacramento Superior Court, California, has rejected a lawsuit demanding that developer Poseidon produce a new environmental study on the proposed Huntington Beach Desalination Plant project.
The suit argued that the developer should conduct an entirely new Environmental Impact Study (EIS) for the project following changes to the proposal. The original EIS was completed in 2010.
The State Lands Commission had already determined that Poseidon need only complete a supplemental report addressing the changes.
The suit was brought by the California Coastkeeper Alliance, the Orange County Coastkeeper and the California Coastal Protection Network. The project changes they cited were the addition of a 1 millimetre intake screen, the possibility for aquifer storage of product water, and variations in water demand since the original report.
The three may now take the case to appeal.
The Huntington Beach plant still requires approvals from the Santa Ana Regional Water Quality Control Board and the California Coastal Commission.
Comments
Login on register to comment
Related content
Related supplier content


Filtration & membranes
Membrane autopsy
The Genesys Membrane Laboratories in Madrid


Filtration & membranes
Multimedia filters, Ion exchangers & reminalizators
FRP pressure media filters produces according project specifications. They can be produced with a nozzle plate with nozzles or with a lateral filtering system. Design can be according EN13121-3


Projects
Metito Products
Metito is the leading provider of choice for total intelligent water management solutions in the emerging markets