CS 125: Extraordinary biofouling reduction in SWRO plant

19% energy cost savings


CS 125: Extraordinary biofouling reduction in SWRO plant

Background

A SWRO plant with 800m³/h capacity affected with biofouling searched for an electricity and operation cost reduction solution.

Objectives

• Less membrane replacement

• Reduction of the electricity cost

Please click here to download the full case study.

Get the newsletter