Project Case Study: Sharqiyah Desalination Plant/Veolia/Sidem

 

  • Plant location: Sharqiyah Desalination Plant in Sur

 

  • Type/Size: Side Entry  

 

  • More than 500 Pressure Vessels 1200 psi

 

  • Main parameters: Capacity 50000 m3/day

 

  • Design standard: ASME Boiler and Pressure Vessel Code

 

  • Estimated COD Date: 2016